1991
On November 13, the executive committee of the Cheboksary City Council of People's Deputies registered EKRA Research and Production Enterprise by Resolution No. 22/467–4
1992
A prototype digital emergency disturbance recorder was installed at the 500 kV Azot substation, Samaraenergo
1993
First disturbance recorder cabinet for Kinderi substation (disturbance recorders Nos. 5, 6) was delivered in 1993.
Photo from 2003: 10 years of work.
1994
Oleg L. Saevich, first CEO of EKRA Research & Production Enterprise from 1994 to 2012
1995
A team of 48 employees moved to the new rented premises of EKRA
1995
First microelectronics-based busbar differential protection (BDP) cabinets were installed at the 220 kV Zelenodolskaya substation, Tatenergo
1995
First generator relay protection devices with microprocessor logic were delivered to Novosibirsk HPP and Kemerovo TPP
1998
Adjustment of the first digital cabinet and training at Novosibirsk HPP
1999
All-digital microprocessor generator protection system was installed at Krasnoyarsk HPP
1999
First deliveries of microprocessor protections for 220 kV power transmission lines to Kinderi substation, Tatenergo
2000
First microprocessor backup protections were recommended for use at 110–220 kV substations in Russia. New relay protection cabinets were put into operation in Russian power systems as well as foreign facilities, for example the cabinets were supplied at Siddhirganj TPP in Bangladesh
2001
In record-breaking time, the Advanced Research Department headed by Nikolay Doni developed the much-needed in Russia main protections for 110–220 kV lines on the phase comparison protection principle
2002
First Russian microprocessor phase comparison protection cabinets were installed on the 220 kV Kinderi - Zeleny Dol overhead line, Grid Company
2003
First Russian microprocessor phase comparison protection cabinets were installed on the 220 kV Kinderi - Zainskaya GRES overhead line, Grid Company
2003
A system of microprocessor protection cabinets for 110–220 kV overhead lines was recommended for use in Russian power systems
2003
EKRA microprocessor protection cabinets were recommended for use on 330–750 kV overhead lines in Russian power systems
2004
Development of a full protection system for 330–750 kV substation equipment protection was completed
2004
First main protections for 500 kV overhead lines were supplied for 3 outgoing lines at the 500 kV Berkut substation, MES of West Siberia
2005
The microprocessor cabinets of main line protections, backup line protections, shunt reactor protections, busbar protections, and circuit-breaker control automation were recommended for use at 330–750 kV facilities in Russia
2005
First deliveries of outdoor low voltage cabinets and circuit-breaker control panels for 220 kV Zhigulevsk HPP
2006
Renovation of Building 3 was completed. New premises are used for development and poduction of low-voltage equipment and systems
2006
A reflow oven SOLANO RO 500 was put into operation. At this stage of production development, electronic components on printed circuit boards were still installed manually
2006
First microprocessor IEDs for 6–35 kV equipment protections were supplied to the 110 kV Ryazan substation, Ryazanenergo
2006
EUROCAT and TUV CERT certificates for compliance of the quality management system with DIN EN ISO 9001:2000
2007
As part reconstruction of Ekibastuz GRES-1, Kazakhstan, another batch of generator-transformer protection cabinets was shipped. Cabinets of ShE1111.36 type were installed in Unit 7 with a 500 MW generator and 630 MW transformer.
2007
Bureyskaya HPP received a shipment of microprocessor protection cabinets of ShE1111 type for generator-transformer units to be installed in Hydroelectric Unit 6
2007
Microprocessor generator protection cabinets of ShE1111 type were shipped to Zhigulevsk HPP, Europe's second largest hydropower plant
2007
First high-voltage electric motor starters of ShPTU series were supplied to Surgutneftegas Rusinskoye field
2007
First deliveries of ShE2607 09h line differential protections for 110–220 kV lines for the 110 kV Tsentralnaya-Yuzhnaya overhead lines of Kazan Power Grids, Grid Company
2007
Relay protection IEDs for medium voltage level of BE2502 series were certified by FGC UES
2008
In September, the first international research and practice conference “Product implementation experience and development prospects of EKRA” was held at EKRA. The conference was attended by over 240 specialists from grid and generating companies, industrial companies, installation and adjustment organizations, design institutes, and representatives of academia from Russia, Kazakhstan, Uzbekistan, Ukraine, and Belarus.
2008
A new 16,000 sqm production building was commissioned, with a design capacity of 4,000 cabinets per year.
2008
First deliveries of relay protection devices based on EKRA 200 series IED to Ivanovskie CCGT, Inter RAO — Electrogeneratsiya
2008
First deliveries of soft starters ShPTU-VI series for medium-voltage motors to start SDMZ-17–59 series synchronous motors of cement ball mills at Volskcement
2008
Soft starters for medium-voltage motors were certified by Transneft
2008
EKRA decides to set up an in-house metalworking production facility. Start of construction works
2009
First delivery of a control and automation system to the 220 kV Amet substation
2009
First deliveries of automatic interlocking systems of disconnectors to the 110 kV Sovetskaya substation, Tyumenenergo
2009
Relay protection cabinets ShE2607 series were certified by Transneft
2009
Auxiliary DC systems were certified by FGC UES
2009
First microprocessor remedial action scheme devices were delivered to Omsk TPP-4
2009
First surface-mounting line was installed and put into production at the IED production facility
2010
Certification committee drew a conclusion that differential line protection cabinets of ShE2607 091, 092, 093 series meet the required standards of FGC UES and are acceptable for application at FGC UES power facilities as multifunctional relay protection devices for 110–220 kV power transmission lines
2010
First supplies of ShPTU-T series soft starters of power transformers for the 6/35 kV GTPP substation at the Ust-Tegusskoye field, TNK-Uvat
2010
Supply of EKRA insulation monitoring system for the auxiliary DC network as part of the DC distribution board at Kaliningrad TPP-2
2010
AC auxiliary distribution boards were certified by FGC UES
2010
Certification of relay protection cabinets ShE2607, ShE2710 series by Gazprom
2010
ShE2607, ShE2710 series cabinets and ShPTU series motor starters were certified by Gazprom
2010
Automatic electroplating line was put into operation
2011
EKRA develops relay protection device BE2704 series with IEC 61850-9-2 LE support
Serial production of BE2704 IEDs with support of MMS and GOOSE communication protocols according to IEC 61850-8-1 was started. Tests confirmed a full compliance of the IEDs with the IEC 61850-8-1 protocol requirements and their reliable operation via this protocol, including the “broadcast storm” mode
2011
First digital static thyristor exciters of SPVD series for synchronous motors were installed at Cheboksary Vodokanal
2011
ShE111hA series cabinets for station equipment protection were certified by Rosatom
2011
Ghorashal Thermal Power Plant, Bangladesh. The geography of EKRA equipment deliveries expanded to 9 foreign countries
2011
Relay protection cabinets of ShE2607, ShE2710 series with IEC 61850-8-1 support were certified by FGC UES
2012
Vladimir Furashov was CEO at EKRA from 2012 to 2015
2012
On February 27, Russian President Dmitry Medvedev visited Chuvashia as part of the Gifted Youth Program. The President visited EKRA, where he met with young scientists and developers of innovative solutions for the Russian power industry and also visited the EKRA Training Center and its laboratory and talked to doctorate students
2012
First ESN series variable frequency converters were delivered to Pes OPS, Baltnefteprovod
2012
Control and automation system testing ground was opened to test technical solutions and simulate system operation under real-life conditions
2012
First line differential protection devices for 330–750 kV lines were delivered to Mangazei substation and Urengoy GRES
2012
First delivery of the control and automation system based on EKRA software and hardware to the 110 kV Perekop substation, Tulenergo
2012
ESN series frequency converters were certified by Transneft
2012
The first optical inspection unit was purchased to automate quality control of electronic unit manufacturing at the IED production facility
2012
The second building was completed at the metalworking plant. A turret punch press and a bending press were purchased to increase production
2012
On December 25, Khabarovsk hosted a commissioning ceremony for the second stage of the Eastern Siberia-Pacific Ocean Pipeline System, ESPO-2.
Soft start systems of mainline pump units for 4 oil pumping stations were manufactured by EKRA. A total of 16 motors of 8 MW and 6.3 MW at 10 kV can be soft-started by the systems. In addition, relay protection equipment and LV equipment and systems were supplied to the oil pipeline facilities.
2013
First delivery of SV-02A time server to Omsk TPP-3
2013
Backup line protection cabinet in conjunction with SAMU via protocol 61850-9-2 LE was put into trial operation at the 220 kV Chistopol substation, Grid Company
2013
Utility connections of electrical installations of the Mountain Olympic Village in the Rosa Khutor ski resort to the FGC UES network were completed. The connected capacity amounted to 4.2 MW.
EKRA supplied remedial action scheme cabinets, relay protection devices, as well as uninterruptible power supply devices for 110 kV Mzymta and Rosa Khutor substations, which supply power to the infrastructure of the 2014 Sochi XXII Winter Olympic Games
For the Olympics power facilities, EKRA supplied relay protection cabinets to protect transformers, busbars, lines, etc.
2013
At the metalworking production facility, two profiling lines were put into operation to make vertical and horizontal profiles for cabinet frames
2013
The third building was completed at the metalworking production facility
2014
The 500 kV Yenisei ultra-high voltage substation (FGC UES facility) was commissioned to supply power to Krasnoyarsk. EKRA supplied phase comparison protection cabinets, and auxiliary distribution boards to the power facility.
2014
The reconstruction of Sayano-Shushenskaya HPP was completed in November 2014. All 10 generators and 5 transformers at the plant are equipped with EKRA relay protection cabinets during a four-year-reconstruction. EKRA also supplied protection cabinets and DC distribution boards for 500 kV substations at Sayano-Shushenskaya HPP.
2014
Digital Substation solutions were implemented at RusHydro Nizhegorodskaya HPP. The innovative software and hardware package was installed and adjusted in compliance with IEC 61850-9.2 standard for Unit 6 of the generator-transformer based on EKRA 200 relay protection and automation IEDs
2014
The first part of EKRA new multipurpose complex was commissioned, which allowed to double output
2014
EKRA developed directional and phase comparison protection system ShE2710 538 for 330–750 kV overhead lines
2014
On September 22, 2014, equipment of the 220 kV “digital” Venets substation (facility of FGC UES Branch — MES of Volga) was put into trial operation.
MES of Volga allocated two 110 kV lines to the digital sunstation trial project. These lines were used to test signal control outputs and switching device models. A maintenance-free outdoor cabinet manufactured by EKRA was installed at the 110 kV outdoo switchgear, including a heating system, temperature and humidity control with data transfer to the SCADA system. The digital substation equipment provides remote control of switching device and circuit-breakers in compliance with IEC 61850 standard. An outdoor cabinet with merging units equipment manufactured by EKRA was also installed at the site.
2014
ESN series frequency converter was successfully tested with the main circulation pump unit of a Rosatom Group nuclear reactor
2014
The second automatic powder painting line Ideal-Engineering A/S was put into operation at the metalworking production facility
2014
Production of medium-voltage and low-voltage equipment was transferred to new production premises
2014
A new Samsung SM482 component mounter was launched on the first line of the IED production facility, boosting the line capacity by 80%
2015
Konstantin Doni has been CEO of EKRA since 2015
2015
BE2704 IED was IEC 61850 certified by UCA international company
2015
On December 10, 2015, Power Unit 4 with a BN-800 reactor was put into operation at Beloyarsk NPP.
In cooperation with KB TEHNAB, EKRA supplied relay protection equipment and remedial action scheme equipment for 220 kV and 500 kV outdoor switchgears and Unit 4 of Beloyarsk NPP
2015
The Center for Certification, Standardization and Testing of the Chuvash Republic was opened at the site of EKRA multipurpose complex. The Center boasts state-of-the-art testing and measuring equipment, including a semi-anechoic modified shielded chamber to test electrical products for compliance with a number of regulatory documents
2015
Balakovo NPP introduced EKRA relay protection devices, based on the majority rule, which significantly increases the reliability of the plant's electrical equipment and reduces the probability of spurious tripping.
The use of digital IEDs also improves protection sensitiveness and drastically reduces response time.
2015
Relay protection cabinets, SCADA, thyristor rectifiers, and insulation monitoring systems were certified by Rosseti
2015
Since 2000, EKRA has supplied relay protection devices for more than a hundred 110–220 kV traction substations of Russian Railways
2016
EKRA equipment was installed at the 110 kV Beregovaya substation, Yantarenergo, the first closed-type power facility in Kaliningrad Region, built as part of preparations for the 2018 FIFA World Cup.
2016
On September 9, at the EKRA multipurpose complex, the industrial chair of automated electric motor drive control systems was opened at the Power Engineering and Electrical Engineering Faculty of I.N. Ulianov Chuvash State University
2016
The second part of the EKRA multipurpose complex was commissioned: production space increased by 14,000 sqm
2016
On April 28, 2016, the Vostochny Cosmodrome conducted its first launch of the Soyuz-2.1a launch vehicle. The 220 kV Ledyanaya substation was comprehensively upgraded with EKRA equipment by FGC UES Branch — MES of East to supply power to the Cosmodrome.
2016
EKRA started serial production of cabinets ShE2607 096 and ShE2607 097 for remote reception and transmission of relay protection and remedial action scheme commands via digital channels
2016
The reconstruction of Production Building 3 was completed in December. The production of relay protection and automation cabinets moved to new premises. This almost doubled the production space
2016
The production space at the multipurpose complex increased to 33,330 m²
2017
EKRA 200 series IEDs successfully passed Level A certification tests carried out by specialists from DNV GL (former DNV KEMA) at the R&D center of FGC UES. As a result of the tests, EKRA received a Certificate of Conformity for implementing the IEC 61850 ed.2 server
2017
On March 20, EKRA Siberia opened its own office, the first representative office of EKRA. The modern building with a total area of 730 m² offers everything for productive work: comfortable offices, a training room with modern equipment, a gym, and a cafeteria
2017
A new laser metal working facility with a fiber energy source allowed to machine nonferrous metals such as copper and aluminum
2017
A production area to assemble and install power cells for frequency converters was set up at the multipurpose complex
2018
BE2704 and BE2502 series IEDs were certified to IEC 61850 edition 2.
Tests carried out by DNV GL experts at the R&D center of FGC UES confirmed compliance with the requirements of IEC 61850 edition 2, parts 6, 7-1, 7-2, 7-3, 7-4, and 8-1.
2018
MOESK builds the 110/20 kV Medvedevskaya substation, designed to power supply facilities located at the Skolkovo Innovation Center.
Medvedevskaya is the first substation in Russia fully equipped with protection, control and automation devices in compliance with IEC 61850-9-2. This allows for data exchange between devices of different makes and models, making it much easier to introduce new equipment into the digital substation system.
In the shortest time EKRA manufactured and supplied relay protection devices of all voltage levels control & automation system; AC & DC low-voltage equipment.
2018
In Tyumen Region, the 500 kV Tobol switching station, FGC UES, and the 500 kV ZapSib central distribution substation were commissioned, which connect Russia's large St. Petrochemical complex for deep processing of hydrocarbons, ZapSibNeftekhim, to the Unified National Power Grid.
The Tobol substation is Russia's first pilot ultra-high voltage power facility with a comprehensive implementation of the latest digital technology.
EKRA supplied to the power facility: line and shunt reactor protection systems, remedial action scheme systems and emergency disturbance recorders in compliance with IEC61850–9.2LE.
2018
The reconstruction of the IED production premises was completed
2019
Devices based on EKRA 200 IEDs were recognized by voluntary certification body UES R&D Center as complying with the requirements of SO UES standard “Relay Protection and Automation. Automatic Emergency Control of Power System Modes. Power Unloading Automation Devices for Power Overloading. Norms and Requirements.” These are the first Russian devices to receive such a certificate.
2019
The 110/6 kV Portovaya substation, Grid Company was commissioned. The new indoor power facility replaces a nearby substation of the same name commissioned in 1957.
Specialists implemented a concept that combines traditional primary equipment with intelligent secondary equipment that enables the conversion of analogue signals into digital ones. A high level of automation is provided by EKRA protection IEDs and control and automation system. More than 200 brand new digital devices were installed at the substation.
2019
The World University Games were held in Krasnoyarsk on March 2–12. Russia hosted the Winter Universiade for the first time ever.
In preparation for the competitions, much attention was paid to the power facilities that provide uninterrupted power supply to Yenisei Stadium, Arena-North, Crystal Arena, Platinum Arena, Ivan Yarygin Sports Palace, and Winter Sports Academy.
EKRA Group supplied its in-house manufactured relay protection equipment to key substations. EKRA-Siberia commissioned equipment at the 110 kV Molodezhnaya substation. This digital substation has a complex of control and automation equipment, main and reserve transformer protection cabinets ShE2607 151, UFLS cabinets ShE2607 211, DC & AC auxiliary distribution boards.
EKRA equipment was also installed at the 110 kV Ozernaya and 110 kV Yubileynaya substations, Krasnoyarskenergo, branch of IDGC of Siberia. The equipment was adjusted with supervision at the facilities by EKRA-Siberia specialists.
2020
EKRASMS-SP software package was included in the Russian software register.
Almost all equipment produced by EKRA is included in the above registers, ensuring compliance of our products with all import substitution requirements, which can be included in procurement documents of our customers according to the current state documents.
2020
A third optical inspection unit and a new automatic PCB washing machine were commissioned at the IED production facility
2020
Assembly of electronic devices was organized for low-voltage equipment and medium-voltage converters
2021
Fitting out of production facilities continued: new AMADA turret punch press was commissioned
2021
A second selective soldering unit was commissioned at the IED production facility
2021
On the first surface-mounting line, an additional DEKAN F2 Hanwha component mounter was put into operation
2021
High-frequency transceiver EKRA 253 0201 was developed to transmit and receive HF protection signals for 35–1,150 kV power transmission lines
2021
Digital fault locator cabinets (with up to 8 IEDs per cabinet) were developed. Deliveries: 110 kV Batovo substation, 110 kV Yasen substation, 110 kV Erginskaya substation.
2021
The production of EKRA A01 multifunctional industrial computers has been launched. These computers are designed to store & process information at power plants, substations and other power facilities
2021
Participation in the Energoproryv-2020 competition and presentation of the work “Digital Automated Measuring and Information System for Electric Power Fiscal Accounting (IEC61850)” in the finals
2021
A moisture-protection coating line for units and PCBs was set up at the multipurpose complex
2021
The company received a Certificate of Conformity for the EKRASCADA software package to use for the fiscal accounting system